Published 2008
Journal article Open

Pioneering the hydropower development

Description

The Clean Energy Development Bank (CEDB) has done a pioneering work to provide the loan for hydro projects without collateral under the "project financing" concept. However, a rigorous project processing regime is required to protect from any risk along with strong and continuous monitoring by the Bank. This paper highlights the requirement of technical due diligence of candidate hydro projects looking for financing. CEDB has developed and adopted a systematic hydropower project processing process Operational Policy and Guidelines. Cost-over run or time overrun due to any reason is the two major concerns for Financier as well as Developer. Rigorous screening is needed to ensure virtual risk proof lending.

Files

6250.pdf

Files (86.9 kB)

Name Size Download all
md5:619f12002844f7d22727fd304f4a7903
86.9 kB Preview Download

Additional details

Publishing information

Title
Hydro Nepal: Journal of Water, Energy and Environment Vol. 1, No. 2(2008) pp. 29-30: http://nepjol.info/nepal/index.php/HN/article/view/1166/1179

Others

Special note
MFOLL

Legacy Data

Legacy numeric recid
13515