2013
  • Non-ICIMOD publication
No Cover Photo

Share

1,102 Views
Generated with Avocode. icon 1 Mask color swatch
0 Downloads

Water Availability Analysis for the Upper Indus, Ganges, Brahmaputra, Salween and Mekong River Basins; Final Report

  • Lutz, A. F.
  • Immerzeel, W. W.
  • Summary
ICIMOD is the implementing agency for the Himalayan Climate Change Adaptation Programme (HICAP) that runs from January 2011 to December 2015. HICAP addresses climate change adaptation challenges across different related disciplines such as water resources, ecosystem services, food security, vulnerability and gender. Part of the project is related to the generation of water availability scenarios from upstream river basins that are primarily characterized by snow and glacial melt. ICIMOD has contracted FutureWater to generate these scenarios based on a high resolution hydrological model that FutureWater has developed. The project runs from January 2012 until July 2013. This final report describes the tasks performed by FutureWater, including results of the hydrological modeling.
  • Pages:
    85 p.
  • Language:
    English
  • Published Year:
    2013
  • Publisher Place:
    Future Water
  • External Link:
    Download